Building Permission
Building works or alterations
All external alterations to properties, including the blocking or partial blocking in of terraces, must have the approval of the owners at an AGM/EGM and may also need permission from the Town Hall. If in doubt contact the administrator or President for clarification.
Owners are requested to complete the form below and notify the President prior to any work starting.
Application Request (Spanish)
Those owners who wish to carry out any alterations on their property must use materials and colours to match the original aesthetics of the community. i.e. The roof tiles must be the same or similar in colour and shape as the existing ones on the community. Bricks and plaster to be painted white.
Exceptions which do not require AGM/EGM approval
– Owners can replace windows and doors with either in white or brown surrounds
– Owners can prepare and use the “under build” as part of a living space of the property, provided it does not exceed the original building line, (the original building line is defined as the original wall enclosing the bottom of the house). The owner must provide the architects’ plans prior to the start of the work. Apartments who wish to use the under build must also have the agreement of the other apartment in the building. A door to the under build is allowed but windows must have permission
– Owners can fill in garden walls (only to the height of the gatepost) with white balustrades or black ironwork. Anything outside these criteria must get permission.
Approved Building Works
The following building works were approved at the 2024 AGM:
HOUSE NUMBER | DETAILS OF WORK | START DATE | END DATE |
---|---|---|---|
123 | CONSTRUCTION OF STORE ROOM AT THE REAR OF THE PROPERTY | TBC | TBC |
123 | INSTALLATION OF BACK GATE TO GARDEN | TBC | TBC |
123 | CONSTRUCTION OF STORAGE AREA IN SOLARIUM USING ROOF SPACE | TBC | TBC |
123 | INSTALLATION OF PATIO DOOR AND BALCONY FROM THE BEDROOM AT THE REAR OF THE PROPERTY | TBC | TBC |
138 | EXTENSION OF THE SHAFT UNDER THE KITCHEN WINDOW | TBC | TBC |
138 | CONSTRUCTION OF A GAS CABINET SIMILAR TO NEIGHBOURS | TBC | TBC |
345 | INSTALLATION OF BASEMENT WINDOW | MAR 24 | MAR 24 |
539 | TERRACE ENCLOSURE SIMILAR TO THAT OF NEIGHBOURS | TBC | TBC |
Further details of these applications can be found here
Other Planned Building Works
HOUSE NUMBER | DETAILS OF WORK | START DATE | END DATE |
---|---|---|---|
361 | INTERNAL BUILDING WORKS | 07/10/24 | 02/12/24 |
507 | NEW KITCHEN | 05/11/24 | 26/11/24 |
123 | VARIOUS BUILDING WORK INTERNALLY AND EXTERNALLY | 11/11/24 | TBC |